Facilities Infrastructure Services & Solutions
Every project that Filcom Technologies LLC has completed is held to the highest standards. Our work has taken us from low key engagements such as the Beirut Tunnel Projects to the heights of the world-renowned Burj Khalifa.
We are passionate about the work that we do and are proud of what we have achieved. The projects we have completed speak for itself: It is our unwavering commitment to total customer satisfaction.
Year: 1998
Filcom did the fiber optic splicing, testing and commissioning of the OPGW cables and SCADA systems for the following DEWA Substations:Jebel Ali Substations to Emirates Tower SubstationOud Metha Substation to Etisalat SubstationOud Metha Substation to Al Ghusais Sub Station
Year: 2000
We provided the design, supply, and installation of around 5,000 UTP cables and 50 runs of multimode fiber cables at the Gulf News offices. Filcom also migrated and activated all the telephone lines for around 400 employees.
Year: 2003
Technology giant SIEMENS engaged Filcom as its Consultant to conduct a full sttudy and design of the network infrastructure of the Bahrain Formula One racetrack. We designed the structured cabling for data and telecom networks, equipment interfacing and communication boards.
Year: 2003
Filcom designed and implemented the full network infrastructure of fiber optic cables that connected all 17 buildings as well as installed and configured all the active network components.
Year: 2003
We did the supply, installation and termination of the entire fiber optic network infrastructure in the refinery. Special fiber optic cables designed for petroleum companies were used. Approximately 5,000 fusion splicing were implemented and 50 telecom cabinets were distributed to various IDF control rooms as well as the main control room.
Year: 2003
Built at the cost of AED 686 million (US$ 190 million) and stretching 1.6 km long, FIlcom was chosen to do the installation of CCTV cameras, fiber optic cables, firefighting equipment and road safety signs. We also installed the fiber optic cables for the humidity and temperature sensors.
Year: 2003
Filcom made a record time accomplishment by installing, terminating, testing, and commissioning the structured cabling system for around 2,000 villas.
Year: 2003
We designed and installed a sophisticated cabling ssytem for the most luxurious ship in the world at that time. Cat7a cables specially designed for ships of this class was used on the Platinum yatch. We modified the telecom cabinets that were supplied to conform to ship building standards.
Year: 2003
We undertook the project management, supply and installation for around 7,000 UTP nodes, linking all the buildings with multi-pair voice grade outdoor tyoe cables for telephone applications and 24 core fiber optic cables for their data applications.
Year: 2004
We did the project management, installation, testing and commissioning for 4,000 UTP Cat6 cables. Filcom credits itself for single handedly executing the supply and installation of the structured cabling requirements for all the DNRD branches including the Immigration Station in the Dubai-Oman border.
Year: 2004
We were responsible for the project management, design, supply and installation of the structured cabling systems for all the buildings, including the design and installation of the main data center cables.
Year: 2004
Filcom did the design, installation, termination, testing, and commissioning of the structured cabling system for the Khaleej Times. The network infrastructure consisted of around 2,000 network points and 26 runs of multimode fiber optic cables.
Year: 2005
We did the project management, installation, testing and commissioning for 5,000 UTP Cat7 cables. It was in this project that Cat7 cables were installed for the very first time in the entire UAE. The fiber optic cables in the IDFs were all fusion spliced. We also did the installation of all the telecom cabinets and equipment.
Year: 2007
Filcom installed the security cameras and door access control systems for the entire building. The task considered of installing around 500 cameras and door access controls for all the doors.
Year: 2008
Since 2008, FIlcom has been handling all the OSP and ISP requirements under P101. This includes all the copper cable installation for network cabling and wifi.
Year: 2010
Filcom had done numerous GSM sites installation for Du, Telecom, from site search, site surveys, site acquisition up to the implementation covering civil works and commissioning of the sites.
Year: 2008
Filcom was one of the first companies to be invited by du-EITC to outsource its technical resources to handle the Enterprise and Consumer Fixed Service Assurance side. Today, FIlcom maintains one of the largest and highly skilled outsource teams in du composed of 70 network Engineers, Field Technicians and Admin Staff.
Year: 2013
Filcom maintains strong business ties with the Majid Al Futtaim (MAF) Group specifically with the management of the City Centre chain of stores. In Deira City Centre, we did the CCTV installation for 750 units, including its cabling infrastructure, WIFI networks design, supply, and installation.
Year: 2013
Our exceptional work at Deira City Centre convinced MAF to engage Filcom's services a second time. At the Sharjah City Centre, we installed 700 CCTVs including the design and installation of fiber optic network infrastructure. We also executed the network design, supply and installation of wifi system. We also did the UTP and fiber cabling.
Year: 2013
Engaging our expert services a third time, Filcom did the CCTV installation of 800 units including the design and installation of fiber network infrastructure. We also did the design, supply, and installation of the wifi system as well as the fiber and UTP cabling.
Year: 2014
We capped our CCTV installation of up to 2,000 units with the work we completed at the Mall of the Emirates. Filcom provided the design and installation of fiber optic network infrastructure. We were also behind the WIFI network design, supply and installation of the WIFI system including the fiber and UTP cabling.
Year: 2014
Since October 2014 FIlcom, in partnership with Alcatel Lucent France, has been migrating Optical Network Terminals (ONTs) to replace the existing FIber Optic system in the Dubai Marina Area. By early January 2015, Filcom's GPON team of 18 dedicated technicians successfully migrated close to 2,000 ONTs covering 11 buildings in the Marina area. Phase 2 of the project poses a serious challenge to the Filcom GPON Team as this will entail migrating at least 4,000 ONTs. Normal 0 false false false EN-US X-NONE AR-SA ...
Year: 2015
This April 2015, Filcom's GPON Team migrated a total of 2,200 subscribers in AMSA 1,2,3,4 and 5. These five buildings, located within the periphery of the Dubai Sports City and Dubai Motor City, serves as the official staff accomodation of Atlantis employees. Three (3) major activities were done by the Filcom GPON Team namely Fiber Optic Splicing, Cable Pulling and Migration. To achieve its targets, Filcom deployed more than doubled its GPON Team by hiring an additional 22 people who serve as Cable Pullers. Filcom also had to purchase ten additional Fusion Splicing Machines so that splicing could be simultaneously done in the MDF Rooms, FTRs and the residential apartments.Filcom partnered with Alcatel Lucent Internat...
Year: 2019
Filcom Technologies LLC was awarded by Aramex (the one of the biggest logistics, courier and package delivery company) to do their Structured cabling and Wireless Access points for their newly built SLB Warehouse.
Year: 2020
Filcom Technologies LLC completed the Fiber Optic Cabling upgradation for 540 Outlets in Mirdiff City center - within 6 months.
Year: 2022
Filcom Technologies LLC completed – Fiber Optic and Electrical Provisioning for DU Antenna 4G signal project at Midriff City center